Thursday, September 11, 2008

Right Wing Superstructure is Complete



Amazing what a little bit of experience does. The right wing went together in an afternoon because of the experience gained with the left wing and having all of the parts prepared and ready to go. Had no problems during the assembly process. Had to "touch drill" a couple of holes. Will get both wings inspected by Jim Smith, our Chapter 75 Technical Counselor before I attach any of the skins and close the wings. A second set of eyes cannot hurt. The installation of the stall warning switch is next and will most likely start on it tomorrow. For the time being, the left wing is sitting on the garage floor on a couple of moving blankets from Harbor Freight.

Time - 5.5 hours