Tuesday, January 20, 2009

Tailcone is Complete




Completed riveting the tailcone. I am very satisfied with all of the skin overlap joints. The Cleaveland tool did a very good job. As I mentioned, I did not rivet the forward 7" of the J-stiffener. Can always do it later. As such, I am complete with this kit for now. Will complete Section 11, Empennage Attachment (mounting of the vertical and horizontal stab to the tailcone) and Section 12, Empennage Fairings (fiberglass fairing work) later, this will give me more storage options.

The fuselage which in currently in the spare bedroom is next. Will spend a day or so studying the plans and looking at the posts on the VAF forums. Also have to download and print the plans revisions from Van's website. Will take the flashdrive to Staples or Kinko's and have them printed on 11"x17" paper.

Took me 108 hours over the course of 23 working days to get the tailcone to this point, with Section 11 & 12 yet to do to totally complete the tailcone kit.

Time - 2.5 hours Total Empennage - 108 hours Wings (Complete) - 175 hours

Monday, January 19, 2009

Tailcone Almost Complete



Riveted the Right and Left Side skins, and then riveted the Upper Right and Left Skins. Riveting took a bit of time, there are a lot of them. There was another step that said to ONLY rivet the holes in the upper left and right skins that are common to the left and right side skins. Again there was no mention of the rivets in the fuselage frame. I riveted the open holes in the fuselage frames on the lower skins and the side skins.

Prepped and primed the F-12106, forward skin rib after attaching the nutplates.

Then cleaned and deburred the top skin. Used the Cleaveland tool to break the edges. It worked extremely well. Made three passes with the tool on each edge, tightening it ever so slightly between passes. There seemed to be a lot more control of the tool doing it this way. Put a bit more of a break on the aft end of the skins per the plans.

Also found it was best to start to cleco the top skin from the aft end working forward. Ensure you catch all of the tabs on the fuselage frames.

When I clecoed to the F-1210C vertical stabilizer bracket, noticed something amiss. There were seven holes in the skin BUT only five holes in the bracket. I match drilled the skin to the bracket such that it matched Figure 2 (inset) on Page 10-10, removed the skin, deburred the holes, and cleaned the few metal flakes in the tailcone. I also radius'd the sharp tips of the F1210-C bracket as suggested on Figure 2 (inset). There is an obvious missing step here.

Attached the forward skin rib (for the vertical stab) and attached the J-stiffener (beveled end aft). Should finish riveting the tailcone on Tuesday. Also, Step 8 on page 10-10 tells you to rivet the 25 holes in the J-stiffener and makes no mention of leaving the forward 7" open (like all other forward holes). Think I will leave them open for now.

Time - 7 hours

Potential Issue with Tailcone Plans-Page 10-10

Reading ahead, I was confused with the installation of the angle at the top and forward end of the fuselage/tailcone.

First look at Page 10-03, Step 7. F-1283C has a flat end and a beveled end. Now look at Page 10-10, Figure 2 and Detail A-A. I cannot tell if the flat end goes forward and the beveled end goes aft. Detail A-A suggests the flat end goes forward. Figure 2 is not clear.

Would seem to make more sense with the beveled end forward because this would then match the J channel at the forward end of the Upper Left and Right Skins (they are beveled at the forward end). But this does not seem to agree with Detail A-A.

Will send Van's an e-mail.

UPDATE: Per an e-mail from Ken Scott at Vans, he tells me that the beveled edge goes aft and the flat edge goes forward. I will install it that way, and, as such the installation will be in agreement with Detail A-A.

Sunday, January 18, 2009

A Little Progress


Finished the edges and deburred the right and left upper skins. Even though not required I broke the edges of these skins ever so slightly and ended up with a very good fit. Could of used about 50-75 more clecos. This must be one of the times during the build why there are so many of them listed on the suggested tool list. Will have to move them as I rivet. No issues. Also, lots of the NFL today. Should be a good Superbowl with the Cardinals and Steelers.

Time - 2 hours

Saturday, January 17, 2009

Installed the Static System

Not too much work on the project today. Installed the static system. After receiving an answer from the VAF forums and a friend I ended up pulling both of the rivets until they snapped. There was plenty of "meat" inside the fuselage to attach the 1/8" tubing. I tried to just partially pull one of the rivets but it continued to spin in the hole. After snapping both, it was time to punch out the mandrels with a 1/16" punch. One of the mandrels came out with a couple of small taps. The other required a few large raps. Backed up the skin with a piece of wood with a hole in it. Adam assisted here cause it takes 3 hands to do this. Attaching the nylon tubing to the "T" was a bit challenging. After about an hour of trying different unsuccessful methods, here is what I ended up doing. I first put a 1/4" length of 1/8" tubing on the T. Then I put the T in the freezer for about fifteen minutes to harden the 1/8" tubing. Then heated the nylon tubing end a bit by placing it in hot, just boiled water. Shook out the moisture and inserted the nylon tubing over the 1/8" tubing on the T. Worked well for me. Picked up some RTV and RTV'd the 1/8" tubing to static port pop-rivet. Mel on the VAF forums suggested to use "electronic" grade RTV as it is much more friendly to aluminum. Will let it sit overnight to cure. Upper right/left skins and top skin tomorrow, that is, if the NFL becomes boring. Hoping for Arizona and Pitt. That would make a good Superbowl.

UPDATE: Here is a static system rivet hint from Mike Tea, received June 2009. "I drilled a 3/16 inch hole thru a block of wood to fit over the static system rivet on the inside of fuselage. An LP4-3 rivet mandrel is smaller than static air rivet mandrel. Cut one off to about 3/8 inch and started it into static port. Then used a C clamp to press the LP4 mandrel into the static port pushing the mandrel head out. Came out pretty easy. Just takes 3 hands."

Time - 2 hours Total Empennage - 96.5 hours Wings (Complete) - 175 hours

Friday, January 16, 2009

Skin Installation and a Static System Question






Riveted the bottom left and right skins together, riveted the same skins to the fuselage frames. The plans tell you ONLY to rivet the lower right an left skins to the bottom skins. I did it that way, leaving the lower right and left skins NOT riveted to the fuselage frames. After discussion with a fellow builder, the plans must be written this way to allow the frames to flex a bit to allow installation of the F-1211 aft bulkhead assembly. On the other hand, maybe a plans omission. But, it doesn't matter. Can rivet them during side skin riveting.

Installed the aft bulkhead assembly. Deburred, finished, and broke the edges of the left and right side skins. Installed the skins and appear to have a good fit. Ran the pitch/trim wire and the strings thru the fuselage. One end of the pitch/trim wire has pins. It appears that the pin side goes forward as lugs are crimped on the aft end, Page 11-06, Step 13.

Started reading the instructions for installation of the static air system and then had to do a bit of research. Was worried there might not be enough meat inside to connect the 1/8" tubing after setting the static air system rivets.

The one page of instructions that comes with the static air kit tells you to set the rivets into the fuselage side skin and after setting the rivet the mandrel is driven out.

A post from Scott on the VAF forums in November 08 indicates.....

"I believe the instructions say to slightly set the rivet, but not enough to break the mandrel. Tap out the mandrel to leave a hollow rivet. Push the static hose over the rivet end and seal it in place with a smear of proseal or RTV around the perimeter. I could be wrong...but thats how I have done it about a dozen times and have never had a leak (in that location anyway )."

Placed a post on the VAF forums asking for the best way to do this?

Time - 5 hours

Thursday, January 15, 2009

Tailcone Assembly Continues






This morning I fitted the aft bulkhead to the HS. This took a bit of time to figure the best washer configuration. I used some very thin shim stock (0.008") with a bit of double stick tape to hold the washers until I could get the bolt thru. Ended up with a 416 inboard on the right bearing and a 416-Light outboard on the right bearing. And with a 416-Light inboard of the left bearing and a 416 outboard of the left bearing. ah!! I did not superglue the washers. Will wait until assembly.

Then started tailcone assembly. All went well. Follow the instructions, use the saw horses. The J-channel fits are tight!! Make double sure all of the tabs are in contact with the skins. I did flip the assembly to ensure all of the tabs were captured by the clecos and there was good contact. With it flipped upright, what seemed to help seat the tabs was to grab now the top of the skin at each rib location and pull the furthest skin and push on the closer skin a bit at the same time. This sort of rounds the skin contour to the rib.

The Cleaveland tool to break the edges of the skins worked very well. I waited until I got to this point before breaking the edges. Because this was a new tool to me I posed a question on the VAF forums and received the following answer from Jim Cone.

"To use this tool, open up the set screw and close the jaws. Then put the tool on the edge of the piece to be broken with the rollers just barely on the edge. Then tighten the set screw just enough to get the rollers to touch the metal. Then open the jaws and close them with the tool set with the edge guide against the edge of the material. Then just pull the tool along the edge without twisting it down. The tool does the work and only bends about 3/16ths inch of the edge down. If the tool does not pull along easily, you have it too tight. Remember, you are not putting a large bend in the edge, but just a 2 degree tilt on the very edge. The tool does that without twisting the tool at all. If you twist the tool down, you will put a crease about 5/8ths inch in from the edge where the inner edge of the tool is. That is not where the break is supposed to be."

And I add...... Playing with the tool if you make three passes with the tool on each edge, tightening it ever so slightly between passes, there seems to be a lot more control of the tool doing it this way!!!

Riveting on Friday.

Time - 7 hours